Helderberg

Paving in Strand

We quote the paving work listed below across Strand. Tell us what you need and we'll come out, measure up and put a written price in front of you — free, and with no obligation.

  • Free, no-obligation on-site quote
  • We measure up at your place in Strand
  • Written price — base, pavers, edging and jointing

Free on-site quote anywhere in Cape TownNo obligationOne short form, however big the job

Helderberg

The Paving We Do in Strand

Strand sits on False Bay between Somerset West and Gordon's Bay. Across Strand and the Greenways, we quote driveways, pool decks, patios and repairs.

The driveway finishes on offer are charcoal interlock, clay brick herringbone, through-coloured concrete and split granite, all priced on a quote that lists the excavation, base and jointing separately.

Paving in Strand

  • Driveway choices. Charcoal interlock, clay brick herringbone, through-coloured concrete or split granite.
  • Pool deck stone. Travertine or slate.
  • Repairs. Existing driveways and patios that have moved, quoted as a repair.
What We Quote

Paving Services in Strand

The paving work we quote in Strand. More on how we work as paving contractors in Cape Town.

Driveway Paving

Charcoal cobbles, clay brick, exposed aggregate or granite, laid on a compacted base with edge restraints.

Learn more →

Pool Surround Paving

Travertine, slate, porcelain and bullnose coping for pool decks, with textured finishes and falls away from the water.

Learn more →

Patio Paving

Sandstone, travertine, porcelain and brick patios, laid to fall so water runs off the entertaining area.

Learn more →

Paving Repairs & Relaying

Sunken sections, broken pavers, empty joints — where the failure is local, we fix just the affected area.

Learn more →

Paving In Strand — What to Expect

Choose your paver from a physical sample in your own light rather than a photo, because colour can vary from batch to batch.

A driveway with block paving and a concrete apron meeting the street
Illustrative, computer-generated image of residential paving, not a photograph of this suburb or of a job we did.

Once the paving is down, plan for the joint sand: the CMA says to top the joints up when required, typically three months after construction.

After that first top-up, our guide covers the ongoing upkeep block paving needs.

How We Work

What You Get From Us in Strand

We Work Across Strand

We take on paving work across Cape Town, Strand included, and we come to you rather than pricing off a map. What decides the job is the paver, the base build-up and the joint detail — and all three go on your quote in writing before anything starts.

Proper Sub-Base, Every Time

Block paving goes on a properly compacted stone sub-base under the bedding sand, with a real edge restraint; stone and porcelain get the base their own specification calls for. The Concrete Manufacturers Association is blunt about why: “Most failures of pavements are due to ingress of water into the pavement layerwork.” Your quote sets out the base build-up in writing.

A Written Price Before We Start

You get a written quote covering the base, the pavers, the edging and the jointing, with the area measured on site rather than guessed over the phone. If something on it isn't clear, ask us and we'll explain it before you commit to anything.

Free On-Site Quote

Tell us what you have in mind and we'll come out to Strand, measure up, look at the fall and the existing surface, and talk through paver options with you. The visit is free and there is no obligation to go ahead.

More Areas

We Also Pave In

Other areas we cover, starting with the rest of the Helderberg.

Get a Free Paving Quote in Strand

We come out to Strand, measure the area, look at the fall and the existing surface, and send you a written price. No call-out fee and no pressure.

Call 021 825 6396Get a Free Quote
Call Free Quote